-
The Awards Conference for Xian Municipal Technological Progress
2009-11
WB-ZJ90DB Drilling Rig Integrated Control System that is developed and manufactured by WBAU has already accomplished all the well sinking missions. The system has been running reliably since it left factory from Dec. 2005, and it ..
View Details
-
WB-ZJ120DB has been ed as the first article by Xian Comming Point
2009-11
On Xi'an Daily of June 11th,the first land VFD control drilling rig system,which is researched and developed by our company successfully,has been publish with the name that Seeking Oil For 10000m Deep Zone--The First High De..
View Details
-
12,000m ultra-deep well drilling rig has been derricked telescoping successfully
2009-11
12,000m ultra-deep well drilling rig has been derricked telescoping successfully and finished on-site testing in Deyang, Sichuanprovince on Feb 2nd, 2008. Shengli Petroleum Administration Bureau has inspected on Mar. 11th. The hig..
View Details
-
The first domestic 12000M drille has passed the SINOPEC acceptance test
2009-11
The first domestic 12000M driller electric control system researched by WEST BRIGHT has finished debugging in Baoji Petroleum and Machine co., ltd. It has passed the SINOPEC acceptance test on Nov 16th, 2007 and each target meets ..
View Details
-
The first deepest ZJ120DB drilling rig control system had been in commissioning
2009-11
On the morning of Sept. 19th, 2007, the first deepest ZJ120DB drilling rig control system in Chinathat our company owns independent had been successfully commissioned, and we performed a grand ceremony. Many leaders and experts wh..
View Details
-
Our campany was awarded the Innovation Campany 2005
2009-11
Our campany was awarded the "Innovation Campany" in acknowledge of manufacturing the first set integrated rig control system ZJ90DB in china .
&nb..
View Details
-
Technical exchange with the engineer of DALMA .Oman
2009-11
The CEO and technical engineer of DALMA .Oman visit our company.
View Details
-
OTC Exhibition
2009-11
We attend the OTC exhibition in Houston in 1st-4th May 2006.
View Details
-
National Oillwell technology cooperation
2009-11
Bob Bloom, Senior Vice President,Chief Engineering and Technology Officerof National Oillwell Varco, visited our company in 3rd Dec 2005
View Details
-
WB-ZJ90DB is awarded Innovation Fund
2009-11
WB-ZJ90DB integrated control system is awarded technical Innovation Fund in Nov 2005
View Details